Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Calculate this in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Add if the length of the reinforced concrete rod is more than 1.5 m, or exclude if the length of the reinforced concrete rod is less than 1.5 m for every 0.5 m when drilling holes in the working area chute, to standard 29-01-124-13 (soil group 4)

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/