| KAVO-ME-KARI-MELI | Mesh in frames | m2 | ||||||||||
| MEDX-ME-KAME-KARI | Metal air ducts | m2 | ||||||||||
| MEDX-ME-KAME-MEME | Fasteners | kg | ||||||||||
| MEDX-ME-KAME-MEME | Plug covers for pitometer hatches | Nr | ||||||||||
| MEDX-TO-KAME-KAME | Throttle valves in the pipe | Nr | ||||||||||
| MEDX-TO-KARI-KALI | Gate valves | Nr | ||||||||||
| ME_MEKAKA_TONE | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KARI_KAKAKARI | Argon gas, highest grade | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEME-KAPU_KAKASARI | Uncoated welding wire SV-08G2S, diameter 2 mm | kg | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MEME-KALI_KATOMETO | Tungsten welding electrodes for welding high-alloy and refractory steels | kg | ||||||||||
| KAME-LI-MELI-KANE_KAKADXRI | Flat cutting disc, dimensions 230x3x22 mm | Nr | ||||||||||
| KAME-LI-MELI-KALI_KAKASATO | Straight profile grinding wheel, dimensions 180x10x22 mm | Nr | ||||||||||
| KAME-LI-RIKA-KAVO_KAKASAME | Colored cotton rags | kg | ||||||||||
| MEPU-PU-KAME-KADX_KAPURILI | Epoxy anti-corrosion primer with zinc content for protecting metal surfaces, consumption 0.20-0.39 kg/m2 | kg | ||||||||||
| MEPU-SA-KADX-MEME_KAMEKARI | White spirit | kg | ||||||||||
| DXME-KASA-KAME_KAMEDX | Tower cranes, lifting capacity 12.5 t | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAME_KAMEDX | Electricity: consumption 8.04 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KAPUSA | Hand and lever winches with a pulling force of 14.72 kN (1.5 t) | Machine hours | ||||||||||
| DXME-KANE-KALI_KAKAME | Manual lever hoists | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITORI | Three-phase welding inverters for argon arc welding, maximum welding current 500 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITORI | Electricity: consumption 3.52 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to 0.7 MPa (7 atm), capacity up to 5.4 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||