AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-RI-KATO-KALI | Bitumen emulsion | t | ||||||||||
| ME_MEKAKA_TOKA | Average workload 3.0 | hrs | ||||||||||
| KARI-RI-KASA-KAPU_RIKAMERI | Crushed stone from dense rock for construction work M 1000, fraction 5(3)-10 mm | m3 | ||||||||||
| MERI-ME-KARI-KANE_KAKAMERI | RKK-350 roofing felt | m2 | ||||||||||
| DXME-KAVO-KARI_KAKATO | Auto-asphalt spreaders, tank capacity 6000 l | Machine hours | ||||||||||
| PU_MEKAKA_KAPUSA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KATO_KATOME | Self-propelled pneumatic wheeled static rollers, weight 14 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KALI_KAMELI | Trailed gravel spreaders, hopper capacity 2.1 m³, working width 250-3000 mm | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-METO-KAME_KARITO | Combined cleaning machines, tank capacity 13 m3, sand spreader body capacity 9 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KATO_KAKATO | Dump trucks, load capacity up to 15 tons | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KALI_KAKAME | Bitumen tankers, tank capacity 16 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||