AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-RI-KATO-KARI | Bitumen primer | t | ||||||||||
| MERI-ME-KARI-MESA | Rolled waterproofing materials | m2 | ||||||||||
| ME_MEKAKA_PUTO | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KANE-KATO_KAKAKARI | PVC anti-corrosion tape with adhesive layer on one side for pipe insulation, black, width 450 mm, thickness 0.4 mm | m2 | ||||||||||
| KAME-LI-RIKA-KAVO_KAKARIME | Fireproof impregnated canvas | m2 | ||||||||||
| KAME-LI-RIKA-KAVO_KAMENERI | Burlap fabric, width 950 mm, surface density 190 g/m2 | 10 m | ||||||||||
| MEME-ME-KARI-KAPU_KAKATOME | Round coniferous timber, unpeeled, length 3-6.5 m, diameter 14-24 cm, grade II-III | m3 | ||||||||||
| MEPU-ME-KASA-KATO_KAKAMEME | Phenol polyvinyl acetate adhesive, grade BF-2N | t | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket 2.6 m3, load capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KAPU_KAMETO | Machines for cleaning and priming pipes with a diameter of 600-800 mm | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KAPU_KAMETO | Electricity: consumption 15.18 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KAPU_KAMELI | Machines for cleaning and insulating pipes with a diameter of 600-800 mm with polymer tapes | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KAPU_KAMELI | Electricity: consumption 11.62 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KASA_KAKAPU | Pipe layers, nominal load capacity 6.3 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KAVO_KAKARI | Equipment for drying pipes with a diameter of 500 mm | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||