AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAPU-ME-KARI-KASA | Heavy concrete mixes | m3 | ||||||||||
| KASA-ME-KAVO-MEPU | Precast reinforced concrete structures | m3 | ||||||||||
| ME_MEKAKA_SAKA | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KATO_KAKAMERI | Dissolved technical acetylene, grade B | t | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-LI-MEME-KALI_KAKATODX | Welding electrodes for welding low-alloy and carbon steels E50, diameter 4 mm | kg | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | t | ||||||||||
| KALI-RI-KALI-MERI_KAKAKAME | Auxiliary metal structures predominantly made of thick-gauge steel or rolled sections, with or without holes | t | ||||||||||
| KAVO-ME-KARI-MEME_KAKARITO | Simple construction forgings (staples, fasteners, clamps), weight up to 1.6 kg | kg | ||||||||||
| KAVO-PU-KARI-KASA_MEKAKAKA | Lightweight welded reinforcement mesh made of reinforcement wire class Vp-1, type 4 | t | ||||||||||
| MEME-ME-KATO-KANE_KAKAVOTO | Edged softwood boards, natural moisture content, length 2-6.5 m, width 100-250 mm, thickness 20-22 mm, grade III | m3 | ||||||||||
| MEPU-PU-KARI-KAPU_KAMEVORI | MA-15 oil paint, colored | t | ||||||||||
| DXME-KASA-KARI_KAKANE | Gantry cranes, lifting capacity 50 t | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKANE | Electricity: consumption 51.15 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-MERI_KAKAME | Rail-mounted jib cranes, lifting capacity 50-100 t | Machine hours | ||||||||||
| PU_MEKAKA_MEKAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-MERI_KAKAME | Electricity: consumption 69 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KAPU_KAKARI | Tractor units, load on the fifth wheel coupling up to 15 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAKARI | Heavy-duty semi-trailers, load capacity up to 40 t | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||