| RISA-ME-KASA-KASA | Broad gauge railway rails, type P65 | m | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RISA-ME-KATO-KAME_KAKAKAME | Spring rod terminal CP-TONEDX.MEKARI | Nr | ||||||||||
| RISA-ME-KATO-KAPU_KAKAKAME | Elastic pads, type CP 369.104 | 100 Nr | ||||||||||
| RISA-ME-KATO-KAPU_KAKAMESA | Steel rail fastening bracket for reinforced concrete rails, type CP-TONEDX.KAKATO | Nr | ||||||||||
| RISA-ME-KATO-KAPU_KAKAMENE | Steel rail fastening bracket for reinforced concrete rails, type CP-TONEDX.MEKAME | Nr | ||||||||||
| RISA-ME-KATO-KANE_KAKATOTO | Single-coil spring washers, type 1, hole diameter M27 | t | ||||||||||
| RISA-ME-KAPU-KAPU_KAKAKATO | Track bolts for fastening rails, diameter M27, length 160 mm, 180 mm, with nut diameter M27 | t | ||||||||||
| RISA-ME-KASA-KAME_KAKAKAME | Double-headed rail plate, type 1P65 | Nr | ||||||||||
| RISA-ME-KANE-MEVO_KAMEKASA | Rubber gaskets for rail base, type TsP-538, TsP-638 | 1000 Nr | ||||||||||
| RISA-TO-KAVO-KAME_PUDXSANE | Reinforced concrete sleeper Sh3-D | Nr | ||||||||||
| RISA-TO-MEPU-KAME_MEDXRIPU | Hexagon head track screws, type TsP 54, diameter M24, length 195 mm | t | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 73 t | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOLI | Wide gauge platforms with roller conveyor | Machine hours | ||||||||||
| DXME-KADX-KASA_KARITO | Broad gauge shunting locomotives, power 880 kW (894.8 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KADX_KAKAME | Double-girder gantry cranes for use at link assembly bases, 10 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KADX_KAKAME | Electricity: consumption 11.31 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KADX_MEKATO | Process lines for assembling links with reinforced concrete sleepers (shop equipment) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 3 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-KADX-KADX_MEKATO | Electricity: consumption 15.18 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||