AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KARI-TO-KAME-KARI | Construction sand | m3 | ||||||||||
| KAPU-ME-KARI-KASA | Heavy concrete mixes | m3 | ||||||||||
| KAPU-TO-KAME-KADX | Ready-mixed heavy cement mortar | m3 | ||||||||||
| KASA-ME-KAME-METO | Reinforced concrete slabs | m3 | ||||||||||
| KAVO-ME-KARI-KATO | Framing details | t | ||||||||||
| MERI-ME-KARI-KANE | Roll roofing materials for the top layer | m2 | ||||||||||
| ME_MEKAKA_TOPU | Worker Category 1 | hrs | ||||||||||
| KAME-RI-KATO-KATO_KAKAMEPU | Hot bitumen roofing mastic MBK-G-55, MBK-G-65, MBK-G-75, MBK-G-85, MBK-G-100 | t | ||||||||||
| KAME-TO-KAME-KAME_KAKAKARI | AI-98, AI-95 automotive gasoline | t | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KALI-KAVO_KAKAKATO | Hard laundry soap 72% | Nr | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MESA-KATO_KAKAPURI | Bolts with nuts and washers for construction | kg | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | t | ||||||||||
| KAME-LI-RIKA-KAVO_KAKASAME | Colored cotton rags | kg | ||||||||||
| KAME-LI-RIKA-KAVO_KAKALIME | Hemp rope, twisted, impregnated, diameter 26 mm | t | ||||||||||
| KAME-VO-KARI-KANE_MEKARIKA | Float glass sheet M4, colorless, nominal thickness 4 mm | m2 | ||||||||||
| KARI-RI-KAME-KATO_KAKAMEVO | Expanded clay gravel M 600, fraction 10-20 mm | m3 | ||||||||||
| KARI-RI-KASA-KAPU_RIKASAVO | Crushed stone from dense rock for construction work M 800, fraction 10-20 mm | m3 | ||||||||||
| KALI-RI-KALI-MERI_KAKAMEME | Metal structures of buildings and structures with a predominance of bent profiles and round pipes | t | ||||||||||
| KAVO-ME-KARI-MEME_KAKAKAME | Forgings from square billets, weight 1.5-4.5 kg | t | ||||||||||
| KAVO-RI-KARI-MEME_KAKAKALI | Double twisted rope TK, construction 6x19(1+6+12)+1 o.s., grade B, made of galvanized wire group G, marking group 1570-1770 N/mm2, diameter 5.5 mm | 10 m | ||||||||||
| KAVO-TO-KATO-KANE_KAKAKARI | Hot-rolled wire in coils, diameter 6.3-6.5 mm | t | ||||||||||
| KAVO-TO-MEME-KAME_MEMEKANE | Hot-rolled steel channels, steel grades St3ps, St3sp, No. 40U, No. 40P | t | ||||||||||
| MEME-ME-KARI-KAPU_KAKATOME | Round coniferous timber, unpeeled, length 3-6.5 m, diameter 14-24 cm, grade II-III | m3 | ||||||||||
| MEME-ME-KATO-KAME_KAKANEME | Edged coniferous timber (spruce, pine), natural moisture content, length 2-6.5 m, width 20-90 mm, thickness 20-90 mm, grade I | m3 | ||||||||||
| MEME-ME-KATO-KANE_KAKALIDX | Edged softwood boards, natural moisture content, length 2-6.5 m, width 100-250 mm, thickness 44-50 mm, grade III | m3 | ||||||||||
| MEME-ME-KATO-KANE_KAKAVOTO | Edged softwood boards, natural moisture content, length 2-6.5 m, width 100-250 mm, thickness 20-22 mm, grade III | m3 | ||||||||||
| MEME-RI-KAVO-KAME_KAKAKAVO | Wet-process wood fiberboard, soft M-2, thickness 12 mm | 1000 m2 | ||||||||||
| MEPU-RI-KAPU-KAME_KAKAKAME | Coal tar for road construction | t | ||||||||||
| MEPU-PU-KAME-KAME_KAKAKATO | GF-021 primer | t | ||||||||||
| MEPU-SA-KARI-KARI_KAMEKARI | Window putty based on drying oil | t | ||||||||||
| MEPU-SA-KASA-KARI_KAKAKAME | Natural drying oil | kg | ||||||||||
| MEPU-SA-KADX-KALI_KAKATOKA | Solvent P-4 | t | ||||||||||
| DXME-KAME-KAME_KATOPU | Bulldozers, power 59 kW (59.7 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAME-KASA_KAVOSA | Single-bucket diesel excavators on crawler tracks, bucket capacity 0.5 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KAME_KAKATO | Hydraulic jacks, lifting capacity 63-100 t | Machine hours | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket 2.6 m3, load capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKARI | Surface vibrators | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKARI | Electricity: consumption 0.68 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Mobile electric bitumen boilers with centrifugal mixer, loading capacity 400 l | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Electricity: consumption 5.94 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KADX_KARITO | Pneumatic rammers powered by mobile compressor units | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MELI-KAPU_MELIME | Welding machines for manual arc welding, welding current up to 500 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_MELIME | Electricity: consumption 7.92 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to 0.7 MPa (7 atm), capacity up to 5.4 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||