Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Build a full estimate in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Auxiliary work during the development and placement of soil by floating dredgers using the layer-by-layer soil support method and the method of filling the crest into a profile structure, into a dump with embankment construction and into a stack, productivity of dredgers (by soil):; 600 m3/h

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/