AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUTO | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAME-KATO_KAKAKARI | Kerosene for technical purposes | t | ||||||||||
| KAME-TO-KASA-MEKA_KAKAKANE | Crystalline casting graphite, grade GL-1 | kg | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| MEPU-PU-KARI-KAPU_KAMEPURI | MA-0115 oil paint, mummy, iron minium | kg | ||||||||||
| DXME-KAME-KAME_KATOPU | Bulldozers, power 59 kW (59.7 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKANE | Gantry cranes, lifting capacity 50 t | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKANE | Electricity: consumption 51.15 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKADX | Electric overhead cranes, lifting capacity 32 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKADX | Electricity: consumption 46.2 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAKARI | Heavy-duty semi-trailers, load capacity up to 40 t | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||