| KAPU-ME-KARI-KASA | Heavy concrete mixes | m3 | ||||||||||
| KASA-ME-KAME-KADX | Precast reinforced concrete rings for wells with a diameter of 700 mm | m | ||||||||||
| KASA-ME-KANE-KANE | Ribbed reinforced concrete slabs for roofing and flooring | m3 | ||||||||||
| KAVO-ME-KARI-KANE | Cast iron manhole covers | Nr | ||||||||||
| MEME-ME-KATO-KANE | Boards | m2 | ||||||||||
| ME_MEKAKA_TODX | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | t | ||||||||||
| KARI-RI-KASA-KAPU_RIKADXKA | Crushed rock from dense rock for construction work M 800, fraction 20-40 mm | m3 | ||||||||||
| KATO-ME-KARI-KATO_KAKAMEME | Quicklime, grade I | t | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMERI | Ready-mixed masonry mortar, cement, M50 | m3 | ||||||||||
| KALI-RI-KALI-MERI_KAKAMEME | Metal structures of buildings and structures with a predominance of bent profiles and round pipes | t | ||||||||||
| KAVO-TO-KATO-KAPU_KAKAMERI | Light wire, diameter 1.1 mm | t | ||||||||||
| KAVO-PU-KATO-KATO_KAKATORI | Hot-rolled reinforcing steel with periodic profile, class A-III, diameter 12 mm | t | ||||||||||
| MEME-ME-KATO-KAME_KAKANETO | Edged coniferous timber (spruce, pine), natural moisture content, length 2-6.5 m, width 20-90 mm, thickness 20-90 mm, grade III | m3 | ||||||||||
| MEME-ME-KATO-KANE_KAKALIDX | Edged softwood boards, natural moisture content, length 2-6.5 m, width 100-250 mm, thickness 44-50 mm, grade III | m3 | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket 2.6 m3, load capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-KAVO-KADX_KARISA | Electric tampers | Machine hours | ||||||||||
| DXME-KAVO-KADX_KARISA | Electricity: consumption 0.73 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MENE-KAME_KAKARI | Mobile power stations, 4 kW capacity | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||