AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TOSA | Worker Category 1 | hrs | ||||||||||
| KAME-RI-KATO-KARI_KAKAMEME | Bitumen-polymer anti-corrosion primer for protecting steel pipelines under insulating tapes with a rubber-based adhesive layer, consumption 0.12 l/m2 | t | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KANE-KATO_KAKAKARI | PVC anti-corrosion tape with adhesive layer on one side for pipe insulation, black, width 450 mm, thickness 0.4 mm | m2 | ||||||||||
| KAME-LI-KALI-MERI_KAKAMERI | Polyethylene wrapping film, thickness 0.6 mm | m2 | ||||||||||
| KAME-LI-MEME-KALI_KAMEVORI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 3 mm | t | ||||||||||
| KAME-LI-MEME-KALI_KARITOKA | Welding electrodes for welding low-alloy and carbon steels UONI 13/55, E50A, diameter 4-5 mm | kg | ||||||||||
| MEME-ME-KATO-KAME_KAKANELI | Edged softwood timber (spruce, pine), natural moisture content, length 2-6.5 m, width 100 mm and above, thickness 100 mm and above, grade III | m3 | ||||||||||
| RITO-SA-KAME-KAVO_KAKASAME | Electrofusion straight-seam and spiral-seam steel pipes, strength class K38, outer diameter 820 mm, wall thickness 10 mm | m | ||||||||||
| DXME-MEKA-KASA_KAKADX | Pipe layers, nominal load capacity 35 t | Machine hours | ||||||||||
| PU_MEKAKA_KADXKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATOTO | Welding units for manual arc welding on a tractor, welding current up to 250 A, number of stations 2, tractor power 79 kW (80.5 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-MERI_KANEME | Tractor-based open drainage systems, capacity 700 m3/hour | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||