| KAME-PU-KAME-KANE | Three-pronged pin crown | Nr | ||||||||||
| KAME-PU-KATO-KAPU | Hexagonal hollow drill steel | kg | ||||||||||
| KAVO-TO-KAME-KARI | I-beams with parallel flange edges | t | ||||||||||
| ME_MEKAKA_SARI | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KATO_KAKAKAME | Acetylene gas, technical grade | m3 | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KANE-KATO_KAKARITO | Polyethylene tapes with adhesive layer, transparent, width 20 mm, thickness 0.08 mm | kg | ||||||||||
| KAME-LI-KADX-KARI_KAKAKAME | Detonite in cartridges, diameter 28 mm | t | ||||||||||
| KAME-LI-KADX-KARI_KAKATOTO | ED-ZD electric detonators | 1000 Nr | ||||||||||
| KAME-LI-KADX-KATO_KAKAKAME | APRN wire for blasting operations, VP brand | 1000 m | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | t | ||||||||||
| KAVO-ME-KARI-MEME_KAKAKAME | Forgings from square billets, weight 1.5-4.5 kg | t | ||||||||||
| MEME-ME-KARI-KADX_KAKAKATO | Mine props made of coniferous wood (pine, fir), length 0.9-4 m, diameter 7-24 cm | m3 | ||||||||||
| MEME-ME-KATO-KASA_KAKANESA | Unedged coniferous boards, natural moisture content, length 2-6.5 m, width 100-250, thickness 30-50 mm, grade III | m3 | ||||||||||
| DXME-KATO-KANE_KAPUKA | Electric bucket loading machines, capacity 1.25 m3/min | Machine hours | ||||||||||
| DXME-KATO-KANE_KAPUKA | Electricity: consumption 7.1 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KAPU-KAME_KAPUNE | Heavy drilling hammers for use with stationary compressor stations | Machine hours | ||||||||||
| DXME-KANE-KATO_KATOTO | Auxiliary mine winches with a pulling force of 13.73 kN (1.4 t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KATOTO | Electricity: consumption 0.46 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KAMERI | Drill bit sharpening machines | Machine hours | ||||||||||
| DXME-RIME-RIRI_TOKAME | Supports for portable pneumatic perforators | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||