AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TOME | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KANE-KATO_KAKARIRI | Polyethylene tape with adhesive layer, transparent, width 50 mm, thickness 0.08 mm | m | ||||||||||
| KAME-LI-MENE-KARI_KAKAKARI | Steel scaffolding with clamps (posts, ties, crossbars, ladders) complete with plugs (clamps, shoes, bolts), without decking boards, scaffolding height up to 60 m | t | ||||||||||
| KAME-LI-RIKA-KAVO_KAKASAME | Colored cotton rags | kg | ||||||||||
| KARI-PU-KARI-KARI_KAKAKAME | Granulated slag | t | ||||||||||
| MEME-ME-KATO-KAME_KAKANETO | Edged coniferous timber (spruce, pine), natural moisture content, length 2-6.5 m, width 20-90 mm, thickness 20-90 mm, grade III | m3 | ||||||||||
| MEME-RI-METO-KANE_KAKAMERI | Flooring boards, thickness 25 mm | m2 | ||||||||||
| MERI-ME-KAME-KATO_KAKATOTO | Diffusion waterproofing film, maximum tensile strength 165/140 N/50 mm | m2 | ||||||||||
| MEPU-PU-KAME-KADX_KATOMEVO | Two-component epoxy amine-curing primer, fast-drying, thick-film coating with high dry residue | l | ||||||||||
| MEPU-PU-KAPU-METO_KARIKASA | Two-component acrylic-polyurethane chemical-curing enamel | l | ||||||||||
| MEPU-SA-KADX-KALI_KAMEKARI | Solvent for polyurethane materials | kg | ||||||||||
| MEPU-SA-KADX-KALI_MEKARIKA | Solvent for epoxy and epoxy-containing paints and primers | l | ||||||||||
| MEPU-SA-KADX-MEME_KAMEKARI | White spirit | kg | ||||||||||
| DXME-KAME-KASA_MEKANE | Single-bucket diesel excavators on pneumatic wheels, bucket capacity 0.25 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KASANE | Electric winches with a pulling force of 78.48 kN (8 t) | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KASANE | Electricity: consumption 0.53 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KATO_KAKAME | Dump trucks, load capacity up to 7 t | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KAPU_KAKAME | Tractor units, load on the fifth wheel coupling up to 12 t | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAMERI | General purpose semi-trailers, load capacity up to 15 t | Machine hours | ||||||||||
| DXME-MEPU-KASA_KASARI | Trailer tanks, capacity 5 m3 | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKARI | Mobile screw compressors with internal combustion engines, pressure up to 1.3 MPa (13 atm), capacity up to 12 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-KAME_KAMETO | High-pressure painting units for painting structural surfaces, power 2 kW | Machine hours | ||||||||||
| DXME-RIME-KAME_KAMETO | Electricity: consumption 0.46 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-KATO_SAKARI | Sandblasting machines operating from mobile compressor units, volume up to 19 l, air consumption 270-700 l/min | Machine hours | ||||||||||
| DXME-RIME-RIRI_NETOVO | Industrial vacuum cleaners, power up to 2000 W | Machine hours | ||||||||||
| DXME-RIME-RIRI_NETOVO | Electricity: consumption 0.66 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||