AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-TO-KAME-KANE | Lubricant | kg | ||||||||||
| KAME-PU-KAME-KATO | Three-cone drill bit | Nr | ||||||||||
| KAME-PU-KATO-KATO | Drilling fluid | t | ||||||||||
| RITO-TO-KAME-KANE | Drill pipes | m | ||||||||||
| RITO-TO-KAME-KALI | Weighted drill pipes | m | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| DXME-KAPU-KAME_MERIKA | Drilling rigs complete with screw downhole motor on truck chassis, drilling depth up to 1200 m, drilling diameter up to 1200 mm, permissible load on hook up to 500 kN (50 t) | Machine hours | ||||||||||
| PU_MEKAKA_KANESA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_SAKANE | Cranes on a truck chassis, lifting capacity 50 t | Machine hours | ||||||||||
| PU_MEKAKA_KAVOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KAPUME | Telescopic loaders, lifting capacity up to 3 t, lifting height up to 16 m | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KANE_KAKASA | Electric drilling fluid mixing units, tank capacity 22 m3 | Machine hours | ||||||||||
| DXME-KALI-KANE_KAKASA | Electricity: consumption 34.5 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KANE_KAMETO | Containers with mixers for storing drilling mud, tank capacity 40 m3 | Machine hours | ||||||||||
| DXME-KALI-KANE_KAMETO | Electricity: consumption 14.04 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KANE_KAMESA | Central coarse drilling fluid cleaning systems complete with a 10 m3 tank, working surface of screens up to 6 m2 | Machine hours | ||||||||||
| DXME-KALI-KANE_KAMESA | Electricity: consumption 2.51 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KANE_KAMELI | Screen hydrocyclone separators for drilling fluid cleaning, complete with a 10 m3 tank, drilling fluid throughput up to 65 l/s | Machine hours | ||||||||||
| DXME-KALI-KANE_KAMELI | Electricity: consumption 1.52 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KAPU_KAKADX | Three-piston drilling pumps for drilling fluid supply, flow rate 86-184 m3/h, outlet pressure 35-18 MPa | Machine hours | ||||||||||
| DXME-MEDX-KAPU_KAKADX | Electricity: consumption 198 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KANE_KAMENE | Horizontal centrifugal mud pumps, capacity 100 m3/h, head up to 32 m | Machine hours | ||||||||||
| DXME-MEDX-KANE_KAMENE | Electricity: consumption 9.9 kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||