Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Open this position in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Drilling of the lower part of the tunnel with a cross-section of up to 20 m2 using drill hammers with the lower bench method without temporary supports in soils of group, 11

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/