AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUTO | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KALI-RIME_KAKAKAME | Charcoal, grade A | t | ||||||||||
| KAME-LI-MESA-KATO_KAKAPURI | Bolts with nuts and washers for construction | kg | ||||||||||
| KAVO-TO-KALI-KAME_KAKALIME | Hot-rolled steel strip, steel grades St3sp, St3ps, dimensions 40x5 mm | t | ||||||||||
| KAVO-TO-KAVO-KARI_KAKASAVO | Hot-rolled steel angle bar, steel grades St3sp, St3ps, shelf width 35-56 mm, shelf thickness 3-5 mm | t | ||||||||||
| MEKA-TO-KARI-KATO_KAKAMERI | Tin-lead solder without antimony, grade POS40 | kg | ||||||||||
| MEPU-PU-KARI-KAPU_KARIKAME | MA-22 oil paint, lithopone white | kg | ||||||||||
| MEPU-PU-KATO-KAPU_KAKAKAME | Coal tar varnish, grade A | t | ||||||||||
| MEPU-PU-KAPU-KADX_KAKARISA | Enamel HV-1100, colored | t | ||||||||||
| MEPU-SA-KASA-KARI_KAKAKAME | Natural drying oil | kg | ||||||||||
| MEPU-SA-KADX-KALI_KAKATOPU | Solvent R-7 | t | ||||||||||
| RIKA-RI-KADX-KAME_KAKATORI | Compound for filling cable joints, brand MBM | t | ||||||||||
| RIRI-RI-KARI-MEPU_KAKAMERI | Galvanized steel wire for overhead communication lines, ordinary, normal precision, classes 1, 2, diameter 2.0 mm | t | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||