AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAPU-ME-KARI-KASA | Heavy concrete mixes | m3 | ||||||||||
| KAPU-TO-KAME-KADX | Ready-made finishing mortar | m3 | ||||||||||
| KAVO-PU-KATO-KATO | Rebar | t | ||||||||||
| ME_MEKAKA_SAKA | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAME-KANE_KAKASAME | Grease, solid, fat-based, type Z | kg | ||||||||||
| KAME-TO-KASA-KATO_KAKAKASA | Purified ammonium sulfate (ammonium sulfate) | t | ||||||||||
| KAME-TO-KASA-KATO_KAKARIME | Double-substituted ammonium phosphate (diammonium phosphate) | t | ||||||||||
| KAME-TO-KASA-RITO_KAMEKATO | Sodium lauryl sulfate | kg | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-MESA-KANE_KAMESAME | Reinforced nails | kg | ||||||||||
| KAME-LI-RIKA-KAVO_KAMENERI | Burlap fabric, width 950 mm, surface density 190 g/m2 | 10 m | ||||||||||
| KARI-TO-KAME-KARI_MEMEMEVO | Natural sand for construction works, class II, medium | m3 | ||||||||||
| KATO-RI-KAME-KAME_KAKAKAME | Portland cement without additives for general construction CEM 0 32.5N | t | ||||||||||
| KAVO-ME-KARI-MEME_KAKARITO | Simple construction forgings (staples, fasteners, clamps), weight up to 1.6 kg | kg | ||||||||||
| KAVO-TO-KATO-KAPU_KAKASAME | Black wire, diameter 6.0-6.3 mm | t | ||||||||||
| KAVO-TO-KATO-KANE_KAKAKAME | Knitting wire | kg | ||||||||||
| KAVO-TO-KASA-KARI_KAKAKAME | Hot-rolled sheet metal, steel grades St3sp, St3ps, width 1200-3000 mm, thickness 9-12 mm | t | ||||||||||
| KAVO-TO-MERI-KAPU_KAKAKAME | Hot-rolled expanded metal, steel grades St3ps, St3sp, width 500 mm, thickness 4 mm | t | ||||||||||
| MEME-ME-KARI-KAPU_KAKATOME | Round coniferous timber, unpeeled, length 3-6.5 m, diameter 14-24 cm, grade II-III | m3 | ||||||||||
| MEME-ME-KATO-KAME_KAKANERI | Edged softwood beams (spruce, pine), natural moisture content, length 2-6.5 m, width 20-90 mm, thickness 20-90 mm, grade II | m3 | ||||||||||
| MEME-ME-KATO-KANE_KAKAVORI | Edged softwood board, natural moisture content, length 2-6.5 m, width 100-250 mm, thickness 20-22 mm, grade II | m3 | ||||||||||
| MERI-ME-KARI-MERI_KAKAKARI | Roofing glassine paper, flammability group G4, tensile strength in the longitudinal direction 215 N/50 mm, heat resistance +80 °C, weight 0.19 kg/m2 | m2 | ||||||||||
| DXME-KASA-KANE_KAKALI | Crawler cranes, lifting capacity 25 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KANE_KASADX | Mine hoists for lining industrial pipes, height 330 m | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 4 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-KALI-KAPU_KARIME | Vibrating hoppers | Machine hours | ||||||||||
| DXME-KALI-KAPU_KATOME | Vibrating chutes | Machine hours | ||||||||||
| DXME-MEPU-KATO_KAKARI | Dump trucks, load capacity up to 10 t | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKAVO | Mobile screw compressors with internal combustion engines, pressure up to 0.7 MPa (7 atm), capacity up to 12 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-MEKA_KAMEME | Stationary electric pumping stations, flow rate 200 m3/h, head 95 m | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-MEKA_KAMEME | Electricity: consumption 29.7 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||