Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Calculate this in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
For each 1 cm change in thickness, add or subtract from standard 31-01-069-3 for the construction of a leveling layer of the base from a crushed stone-sand-cement mixture (CSCM) treated with cement, using tracked asphalt pavers, with a base layer thickness of 20 cm

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/