AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUNE | Worker Category 1 | hrs | ||||||||||
| KAVO-TO-KAPU-KARI_KAKANETO | Hot-rolled round steel bars, steel grades St3sp, St3ps, diameter 5-12 mm | t | ||||||||||
| MEME-TO-KATO-MESA_KAKAMEME | PVC insulation edge | kg | ||||||||||
| RIKA-ME-KAME-MEKA_KAKAKAME | PA-2-1 connecting plate clamp | Nr | ||||||||||
| RIKA-ME-KARI-MEPU_KAKAKARI | Earring Sr-4.5 075 | Nr | ||||||||||
| RIKA-ME-KARI-MESA_KAKAMEME | Aluminum and steel-aluminum wire connector (SOAS) 062-3 | Nr | ||||||||||
| RISA-RI-KAME-KAPU_KAKAKAME | KS-068 fork clamp inserts | 100 Nr | ||||||||||
| RISA-RI-KAME-KAPU_KAKAKATO | KS-067-1 saddle inserts | 100 Nr | ||||||||||
| RISA-RI-KAME-KANE_KAKATORI | KS-066-2 flat clamp for grounding wire | Nr | ||||||||||
| RISA-RI-KAME-MEME_KAKAKARI | KS-006 fork clamp for earring | Nr | ||||||||||
| RISA-RI-KAME-MENE_KAKAKASA | Single saddle for pestle KS-009 | Nr | ||||||||||
| RISA-RI-KAME-RIME_KAKAPURI | KS-078 locks | 100 Nr | ||||||||||
| RISA-RI-KARI-KAVO_KAKAKARI | Galvanized steel spark gap mounting assembly, types 1, 2, 3 | Nr | ||||||||||
| RILI-RI-KATO-KAME_KAKAMENE | Group grounding cable anchoring bracket, length 560 mm, channel width 160-220 mm | Nr | ||||||||||
| RILI-RI-KATO-KAME_KAKAMELI | Group grounding cable bracket, length 310 mm, channel width 160-220 mm | Nr | ||||||||||
| DXME-KADX-KAME_KAMEME | Railcars for operation on a contact network with an insulated mounting platform and a crane unit equipped with removable cradles | Machine hours | ||||||||||
| PU_MEKAKA_KANESA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 73 t | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||