| KAME-PU-KAME-KANE | Rotary drilling bits | Nr | ||||||||||
| KAME-PU-KAME-KAVO | Immersion pneumatic hammers | Nr | ||||||||||
| KAME-PU-KARI-KAPU | Drill rods | Nr | ||||||||||
| KAME-PU-KATO-KAME | Bentonite powders | t | ||||||||||
| KAME-LI-MELI-KARI | Perforated injector | Nr | ||||||||||
| KATO-RI-KAME-KAME | Portland cements without additives | t | ||||||||||
| RITO-TO-KATO-KARI | Steel pipes | m | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| KAME-TO-KASA-RITO_KAMEVOME | Liquid sodium caustic soda | t | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAPU-TO-KARI-KADX_KALIKATO | Cement-based dry waterproofing mixtures with modifying additives for eliminating active leaks in concrete and reinforced concrete structures, setting time 3 min, class B15 (M200), F25, W6, consumption 1800 kg/m3 | t | ||||||||||
| DXME-KATO-MEME_KAKARI | Auxiliary transfer trolleys | Machine hours | ||||||||||
| DXME-KAPU-KAME_KASARI | Non-self-propelled rotary drilling rigs, drilling depth up to 500 m, well diameter 151-42 mm | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAPU-KAME_KASARI | Electricity: consumption 11.22 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KAME_KAKATO | Hydraulic jacks, lifting capacity 63-100 t | Machine hours | ||||||||||
| DXME-KALI-KAVO_KARIME | Stationary mortar mixers for preparing cement-water and other mortars, capacity 350 l | Machine hours | ||||||||||
| DXME-KALI-KAVO_KARIME | Electricity: consumption 1.32 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KADX_KAKARI | Automated cementing units, capacity 15 m3/h | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KADX_KAKARI | Electricity: consumption 5.61 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KASA_KADXME | Cement spreaders for joint filling | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 73 t | Machine hours | ||||||||||
| DXME-KADX-KAPU_KAKARI | Wide-gauge freight crane draisines, crane capacity 3.5 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAMESA | Mobile screw compressors with internal combustion engines, pressure 0.8 MPa (8 atm), capacity up to 6.3 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKANE | Hammers for working from stationary compressor stations | Machine hours | ||||||||||
| DXDXDX_DXDXKAKA | Construction waste | t | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||