AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-LI-MENE-KAPU | Metal formwork (depreciation) | set | ||||||||||
| KASA-RI-KARI-RITO | Concrete pads | Nr | ||||||||||
| ME_MEKAKA_TOTO | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAPU-KARI_KAKAKAPU | M-10DM diesel engine oil | kg | ||||||||||
| KAVO-PU-KATO-KARI_KAKAKARI | Hot-rolled smooth reinforcing steel, class A-I, diameter 6-22 mm | t | ||||||||||
| MEME-ME-KATO-KAME_KAKANENE | Edged timber of coniferous species (spruce, pine), natural moisture content, length 2-6.5 m, width 100 mm and above, thickness 100 mm and above, grade II | m3 | ||||||||||
| MEME-ME-KATO-KANE_KAKALIKA | Edged board of coniferous species, natural moisture content, length 2-6.5 m, width 100-250 mm, thickness 25 mm, grade II | m3 | ||||||||||
| RITO-TO-KANE-KAPU_KAKAMEME | Non-galvanized welded steel pipes for water and gas pipelines with threads, light, nominal diameter 50 mm, wall thickness 3 mm | m | ||||||||||
| DXME-KASA-KAME_KAMESA | Tower cranes, load capacity 50 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAVOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAME_KAMESA | Electricity: consumption 13.48 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KATO_KAKAME | Dump trucks, load capacity up to 7 t | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||