AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-LI-MENE-KAPU | Formwork inventory (depreciation) | set | ||||||||||
| KAPU-TO-KARI-KAPU | Concrete mixes, BSG, heavy concrete | m3 | ||||||||||
| KAVO-TO-KAVO-KARI | Hot-rolled equal angle steel | t | ||||||||||
| KAVO-TO-MEME-KAME | Hot-rolled channels | t | ||||||||||
| KAVO-PU-KARI-KAME | Reinforcing mesh | t | ||||||||||
| KAVO-PU-KATO-KATO | Rebar | t | ||||||||||
| RITO-TO-KATO-KARI | Seamless hot-rolled steel pipes | m | ||||||||||
| RITO-NE-KARI-KATO | Embedded parts | m | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-TO-KAPU-KAVO_KAKAMERI | Anthracene oil | t | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KANE-KAPU_KAKAKASA | Glass fiber reinforcement tape with adhesive layer for joining sheet materials, width 50 mm | 100 m | ||||||||||
| KAME-LI-KALI-MERI_KAKARIPU | Polyethylene film, thickness 0.15 mm | m2 | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MERI-KASA_MEKAMEVO | Non-woven polypropylene geotextile, needle-punched, thermally bonded, surface density 550 g/m2 | m2 | ||||||||||
| KAME-LI-MESA-KATO_KAKAMEPU | Steel bolts with hexagonal heads, complete with hexagonal nuts and flat round washers, thread diameter M16, bolt length 25-200 mm | t | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | t | ||||||||||
| KAVO-TO-KATO-KANE_KAKAMERI | Low-carbon steel knitting wire | t | ||||||||||
| MEME-ME-KATO-KANE_KAKALIDX | Edged softwood boards, natural moisture content, length 2-6.5 m, width 100-250 mm, thickness 44-50 mm, grade III | m3 | ||||||||||
| MEME-TO-KATO-MESA_MEKAMERI | Plastic reinforcement protective layer fasteners, star shape, concrete protective layer thickness 25 mm | 100 Nr | ||||||||||
| RIPU-RI-KATO-KAME_KAKAKAME | Concrete pipe lock, diameter 125 mm | Nr | ||||||||||
| RIPU-RI-KATO-KAME_KARIKAME | Steel concrete pipe section for feeding concrete mix, inner diameter 125 mm, wall thickness 4.5 mm, length 3000 mm | Nr | ||||||||||
| DXME-KATO-MEDX_KADXME | Hand-held pneumatic wrenches for use with stationary compressor stations | Machine hours | ||||||||||
| DXME-KANE-KATO_KATOTO | Auxiliary mine winches with a pulling force of 13.73 kN (1.4 t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KATOTO | Electricity: consumption 0.46 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KARI_KARIME | Trailer-mounted electric concrete pumps, capacity 60 m3/h | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KARI_KARIME | Electricity: consumption 24.75 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOPU | Narrow gauge platforms | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MENE_KAKAME | Combined electric press shears, nominal force 630 kN, power 5 kW | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MENE_KAKAME | Electricity: consumption 1.58 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||