AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_SANE | Worker Category 1 | hrs | ||||||||||
| KAME-ME-KARI-MEKA_MEKARIRI | Chrysotile (chrysotile asbestos), group 6K, grades 6K-45, 6K-30, 6K-20, 6K-5 | t | ||||||||||
| KAME-TO-KAME-KALI_KAKAKANE | Furfural alcohol | t | ||||||||||
| KAME-TO-KASA-MEKA_KAKAKAME | Ground graphite | t | ||||||||||
| KAME-LI-MEPU-KAPU_KAKAMEME | Technical polyethylene polyamine | t | ||||||||||
| KARI-TO-KAME-KALI_KAKAMEME | Quartz powder | t | ||||||||||
| MEKA-RI-KARI-KAVO_KAKAKAME | Round soft electrical copper wire, diameter 1.0-3.0 mm and above | t | ||||||||||
| MEPU-RI-KAPU-KATO_KAKAMESA | ED-20 epoxy resin | t | ||||||||||
| MEPU-RI-KAPU-KAPU_KATOKANE | Furan-epoxy resin | kg | ||||||||||
| MEPU-SA-KADX-KAME_KAKAKAME | Technical acetone, grade I | kg | ||||||||||
| DXME-KANE-KANE_KAPUVO | Single-mast hoists, load capacity up to 500 kg, lifting height 45 m | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAVO_KARIPU | Mobile mortar mixers, drum capacity 65 l | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||