AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-RI-KATO-KATO | Mastic | t | ||||||||||
| KALI-RI-KALI-KAPU | Custom metal structures | t | ||||||||||
| ME_MEKAKA_TOLI | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAVO-TO-KATO-KASA_KAKAMELI | Low-carbon galvanized steel wire for various purposes, diameter 3.0 mm | t | ||||||||||
| KAVO-TO-KALI-KAME_KAKAPURI | Hot-rolled steel strip, steel grades St3sp, St3ps, dimensions 40x4 mm | t | ||||||||||
| KAVO-PU-KATO-KARI_KAKAKARI | Hot-rolled smooth reinforcing steel, class A-I, diameter 6-22 mm | t | ||||||||||
| MEPU-PU-KARI-KAPU_KAMEPURI | MA-0115 oil paint, mummy, iron minium | kg | ||||||||||
| MEPU-PU-KATO-KATO_KAKAKARI | BT-123 bitumen varnish | t | ||||||||||
| RIKA-RI-MEKA-KATO_KAKAKAPU | Copper cable lugs, conductor cross-section 16 mm2, hole diameter 8 mm | 100 Nr | ||||||||||
| RIKA-RI-MEKA-KATO_KAKAKASA | Copper cable lugs, conductor cross-section 35 mm2, hole diameter 10 mm | 100 Nr | ||||||||||
| RITO-SA-KARI-KARI_KAKARISA | Electric-welded straight-seam steel pipes made of St2 and 10 steel, outer diameter 32 mm, wall thickness 2.2 mm | m | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATORI | Welding units with internal combustion engine for manual arc welding, trailer-mounted, welding current up to 250 A, number of stations 2 | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||