AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-LI-MELI-KADX | Drill bits, drill bits | Nr | ||||||||||
| KARI-RI-KASA-KAPU | Crushed stone | m3 | ||||||||||
| KARI-TO-KAME-KARI | Construction sand | m3 | ||||||||||
| KATO-RI-KAME-KAME | Portland cements without additives | t | ||||||||||
| KAVO-ME-KASA-KARI | Inlet valves | Nr | ||||||||||
| KAVO-ME-KASA-KATO | Galvanized steel deflector apron | Nr | ||||||||||
| KAVO-ME-KASA-KATO | Round ventilation deflector made of galvanized steel | Nr | ||||||||||
| KAVO-ME-KASA-KATO | Steel sleeve for the upper end of the waste chute barrel | Nr | ||||||||||
| KAVO-ME-KASA-KAPU | Waste bins | Nr | ||||||||||
| KAVO-ME-KASA-KANE | Head for cleaning, washing, disinfection, and fire extinguishing system | Nr | ||||||||||
| KAVO-ME-KASA-KANE | Cleaning, washing, disinfection and fire extinguishing systems | set | ||||||||||
| KAVO-ME-KASA-KAVO | Steel waste chute gate valve | set | ||||||||||
| KAVO-ME-KASA-KAVO | Steel waste chute gate pipe | Nr | ||||||||||
| ME_MEKAKA_TOVO | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KALI-RIDX_KAMEMEME | Resin-impregnated tow | kg | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MESA-KATO_KAKAKAME | Anchor bolts made of straight or bent round rods with threads, complete with nuts and washers | t | ||||||||||
| KAME-LI-MESA-KATO_MEKAKAPU | Bolts for mounting steel structures, complete with nuts and washers, diameter 6-8 mm, length 55-80 mm | kg | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | t | ||||||||||
| KAVO-ME-KASA-KATO_MEKAMEPU | Steel support flange, inner diameter 450 mm, flange height 50 mm, outer pipe diameter 392 mm | Nr | ||||||||||
| KAVO-ME-KASA-KATO_MEKAMEVO | Metal clamp for connecting garbage chute pipes, width 60 mm, clamp diameter 425-440 mm | Nr | ||||||||||
| KAVO-ME-KASA-KATO_MEKARIRI | Metal fastening clamp for fastening the apron of the garbage chute shaft, width 60 mm, clamp diameter 280 mm | Nr | ||||||||||
| KAVO-TO-KATO-KANE_KAKAMERI | Low-carbon steel knitting wire | t | ||||||||||
| MEME-ME-KATO-KANE_KAKALIKA | Edged board of coniferous species, natural moisture content, length 2-6.5 m, width 100-250 mm, thickness 25 mm, grade II | m3 | ||||||||||
| MEPU-PU-KARI-KAPU_KAMELISA | MA-15 oil paint, iron red | t | ||||||||||
| RIME-ME-KANE-KALI_MEPURITO | Power cable with aluminum conductors NAYYng(A) 3x4+1x2.5-660 | 1000 m | ||||||||||
| RIPU-RI-KAPU-KAME_MEKAMERI | Flexible reinforced water supply hoses, anti-vibration, complete with gaskets, diameter 15 mm, length 500 mm | set | ||||||||||
| RIPU-RI-KASA-KAME_KAKAKASA | Non-pressure chrysotile cement pipes, nominal diameter 300 mm | m | ||||||||||
| RIPU-RI-KASA-KAME_KAKAKANE | Non-pressure chrysotile cement pipes, nominal diameter 400 mm | m | ||||||||||
| RIPU-RI-KANE-KAPU_KAKAKANE | Chrysotile cement coupling for non-pressure pipes BNM, nominal diameter 400 mm | Nr | ||||||||||
| DXME-KASA-KAME_KAMELI | Tower cranes, lifting capacity 8 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAME_KAMELI | Electricity: consumption 6.83 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATOPU | Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 1 | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||