AI
CSI
NRM2
Workers
Quick Facts
Total Cost
0
Workers/Unit
h
Labor Hours
0
Resources
0
Machines
0
Steps
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TOKA | Average workload 3.0 | hrs | ||||||||||
| KAME-LI-MESA-KALI_KAKAVORI | Polypropylene anchor dowel nails with flange, diameter 6 mm, length 40 mm | 100 Nr | ||||||||||
| KALI-RI-KANE-KATO_KAMEMERI | Galvanized steel guide profile for installing gypsum partitions and suspended ceilings, dimensions 50x40 mm, steel thickness 0.6 mm | m | ||||||||||
| KALI-RI-KANE-KATO_KAMEDXSA | Galvanized steel rack profile, dimensions 50x50 mm, thickness 0.6 mm | m | ||||||||||
| MEME-ME-KATO-KAME_KAKAKAME | Planed softwood bars (pine, spruce), dimensions 50x50 mm, grade AB | m3 | ||||||||||
| DXME-KANE-KANE_KAPUVO | Single-mast hoists, load capacity up to 500 kg, lifting height 45 m | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||