Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Continue in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Installation of a vertical conveyor for removing rock during tunnel boring using mechanized tunnel boring machines with a diameter of over 10.6 m and a belt width with a corrugated edge, over 1200 to 1400 mm

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/