Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-RI-KATO-KATO | Mastic | t | ||||||||||
| KAPU-ME-KARI-KASA | Heavy concrete mixes | m3 | ||||||||||
| KAVO-PU-KATO-KATO | Rebar | t | ||||||||||
| MEME-ME-KATO-KANE | Boards | m2 | ||||||||||
| ME_MEKAKA_TOME | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | t | ||||||||||
| KARI-TO-KAME-KARI_MEMEMEVO | Natural sand for construction works, class II, medium | m3 | ||||||||||
| KATO-ME-KARI-KATO_KAKAMEME | Quicklime, grade I | t | ||||||||||
| KALI-RI-KALI-MERI_KAKAMEME | Metal structures of buildings and structures with a predominance of bent profiles and round pipes | t | ||||||||||
| MEME-ME-KARI-KAPU_KAKATOME | Round coniferous timber, unpeeled, length 3-6.5 m, diameter 14-24 cm, grade II-III | m3 | ||||||||||
| MEME-ME-KATO-KANE_KAKALIDX | Edged softwood boards, natural moisture content, length 2-6.5 m, width 100-250 mm, thickness 44-50 mm, grade III | m3 | ||||||||||
| MEPU-PU-KATO-KAPU_KAKAKARI | Coal tar varnish, grade B | t | ||||||||||
| MEPU-SA-KALI-KAME_KAKAMEME | Aluminum powder PAP-1 | t | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket 2.6 m3, load capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Mobile electric bitumen boilers with centrifugal mixer, loading capacity 400 l | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Electricity: consumption 5.94 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MENE-KAME_KAKAME | Mobile power stations, power 2 kW | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||