AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KALI-RI-KALI-METO | Steel structures | t | ||||||||||
| ME_MEKAKA_PUSA | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEME-KALI_KAKAPUME | Welding electrodes for welding low-alloy and carbon steels E55, diameter 4 mm | t | ||||||||||
| KAVO-TO-MEME-KAME_MEMEKAKA | Hot-rolled steel channels, steel grades St3ps, St3sp, No. 5U-10U, No. 5P-10P | t | ||||||||||
| RISA-ME-KAME-KASA_KAKARISA | Sleeper made of coniferous wood, impregnated, type II, length 1500 mm | Nr | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMEVO | Mobile cranes, lifting capacity 70 t | Machine hours | ||||||||||
| PU_MEKAKA_KAVOSA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAKARI | Heavy-duty semi-trailers, load capacity up to 40 t | Machine hours | ||||||||||
| DXME-MESA-KARI_KARILI | Crawler tractors, power 132 kW (134.2 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MELI-KAPU_MELIME | Welding machines for manual arc welding, welding current up to 500 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_MELIME | Electricity: consumption 7.92 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||