AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MERI-ME-KARI-MESA | Rolled waterproofing materials | m2 | ||||||||||
| MERI-RI-KASA-KANE | Polystyrene foam boards | m3 | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-LI-KALI-RINE_KAKARINE | Polyethylene foam thermal insulation sealing cord, round solid cross-section, density 25-40 kg/m3, diameter 30 mm | 100 m | ||||||||||
| KAME-LI-KALI-RINE_MEKAKANE | Foam polyethylene thermal insulation products (gaskets) for sealing joints of prefabricated elements of enclosing structures, round solid cross-section, diameter 50 mm | 10 m | ||||||||||
| KAME-LI-KALI-RILI_MEKAKARI | Elastic PVC waterproofing key, 4 ribs, width 320 mm | m | ||||||||||
| KAME-LI-KALI-RILI_MEKAKAPU | Universal rubber waterproofing spline with solid thickenings on the sides with a diameter of 13 mm and a hollow thickening in the center with a diameter of 23.5 mm, width 120 mm | m | ||||||||||
| MERI-RI-KAPU-MEKA_KAKAMERI | Thermal insulation mats made of super-thin glass staple fiber without binder, thickness 40-80 mm | m3 | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKATO | Flatbed trucks, load capacity up to 10 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||