| KALI-RI-KALI-METO | Steel structures | t | ||||||||||
| ME_MEKAKA_TOLI | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MESA-KARI_KAKANERI | Galvanized steel bolts with hexagonal heads, thread diameter M8 (M10, M12, M14), length 16-190 mm | t | ||||||||||
| KAME-LI-MESA-KARI_KAKANENE | Galvanized steel bolts with hexagonal heads, thread diameter M20 (M22), length 40-200 mm | t | ||||||||||
| KAME-LI-MELI-KANE_KAKADXRI | Flat cutting disc, dimensions 230x3x22 mm | Nr | ||||||||||
| KAME-LI-MELI-KALI_KAKASAPU | Straight profile grinding wheel, dimensions 230x5x22 mm | Nr | ||||||||||
| MEPU-PU-KAME-KAME_KAKAKATO | GF-021 primer | t | ||||||||||
| DXME-KASA-KAME_KAMEVO | Tower cranes, lifting capacity 10 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAME_KAMEVO | Electricity: consumption 7.84 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKALI | Electric bridge cranes, load capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKALI | Electricity: consumption 7.33 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KAPUDX | Manual and lever winches with a pulling force of up to 9.81 kN (1 t) | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||