AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MEPU-PU-KAME-RIME | Primer | t | ||||||||||
| MEPU-PU-KATO-MESA | Two-component polyurethane finishing varnish | kg | ||||||||||
| ME_MEKAKA_TOKA | Average workload 3.0 | hrs | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| MERI-RI-KATO-MEME_KAKAMERI | Glass insulation fabric, density 230 g/m2, thickness 0.2 mm | m2 | ||||||||||
| MEPU-RI-KASA-KATO_KAKAMEKA | Two-component polyurethane compound for monolithic floor coatings, consumption 2.3 kg/m2 at a layer thickness of 1.5 mm | kg | ||||||||||
| DXME-KANE-KANE_KAPUVO | Single-mast hoists, load capacity up to 500 kg, lifting height 45 m | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-RIRI_NETOVO | Industrial vacuum cleaners, power up to 2000 W | Machine hours | ||||||||||
| DXME-RIME-RIRI_NETOVO | Electricity: consumption 0.66 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||