AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_RITO | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAVO-ME-KARI-MEME_KAKAKAME | Forgings from square billets, weight 1.5-4.5 kg | t | ||||||||||
| KAVO-RI-KARI-KASA_KAKAPUPU | Double-twisted rope LK-R, construction 6x19(1+6+6/6)+1 o.s., grade B, made of uncoated wire, marking group 1570-1770 N/mm2, diameter 16.5 mm | 10 m | ||||||||||
| KAVO-TO-KATO-KAPU_KAKASAME | Black wire, diameter 6.0-6.3 mm | t | ||||||||||
| MEME-ME-KARI-KASA_KAKAKARI | Round coniferous timber for processing, diameter 20-24 cm, grade I-III | m3 | ||||||||||
| MEME-ME-KARI-KANE_KAKAKAME | Round timber (logs) of coniferous species (pine, spruce) unpeeled for piles, length 4.5-13 m, diameter 22-34 cm, grade I-III | m3 | ||||||||||
| DXME-KARI-KATO_KARIME | Diesel hammers, impact part weight 0.6 t | Machine hours | ||||||||||
| DXME-KANE-KATO_KAPUNE | Hand and lever winches with a pulling force of 29.43 kN (3 t) | Machine hours | ||||||||||
| DXME-RIKA-KARI_KAKAPU | Non-self-propelled barges, load capacity 400 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIKA-KATO_KAKATO | Tugs, power 331 kW (335.6 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 4 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-KADX_KAKAME | Non-self-propelled floating cranes, 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 5 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-MEME_KAMERI | Unloading pontoons, load capacity 10 tons | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||