| KAPU-ME-KARI-KASA | Heavy concrete mixes | m3 | ||||||||||
| KAPU-TO-KAME-KADX | Ready-made finishing mortar | m3 | ||||||||||
| KASA-ME-KAME-KAVO | Wells (Precast concrete structures) | m3 | ||||||||||
| KAVO-ME-KARI-KANE | Cast iron manhole covers | Nr | ||||||||||
| KAVO-ME-KARI-KANE | Cast iron grates for manholes | t | ||||||||||
| ME_MEKAKA_RIVO | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KARI-RI-KASA-KAPU_RIKADXKA | Crushed rock from dense rock for construction work M 800, fraction 20-40 mm | m3 | ||||||||||
| RIPU-RI-KASA-KATO_KAKAKATO | Chrysotile cement pressure pipes, class BT6, nominal diameter 200 mm | m | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket 2.6 m3, load capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KADX_KARITO | Pneumatic rammers powered by mobile compressor units | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to 0.7 MPa (7 atm), capacity up to 5.4 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||