AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TOSA | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KANE-KAME_KAKAMEME | Waterproofing and vapor barrier sealing tapes made of butyl rubber, laminated with canvas on one side, with an adhesive layer on one side, gray in color, 100 mm wide, 1.5 mm thick | m | ||||||||||
| KAME-LI-MESA-MEPU_KAMEVOME | Self-tapping steel screws, oxidized, with countersunk head and cross-shaped slot, pointed, diameter 2.5 mm, length 25 mm | t | ||||||||||
| MERI-ME-KAME-KATO_KAKATODX | Roofing waterproofing film, anti-condensation, polypropylene fabric base laminated on both sides with polypropylene, longitudinal/transverse tensile strength 900/800 N/50 mm, surface density 130 g/m2 | m2 | ||||||||||
| MERI-ME-KATO-KADX_MEKAKAVO | Ventilation element of the lower protective PVC film, dimensions 360x120x20 mm | Nr | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KANE_KAPUSA | Single-mast hoists, load capacity up to 500 kg, lifting height 15 m | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||