AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUSA | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KALI-RIDX_KAMEMEME | Resin-impregnated tow | kg | ||||||||||
| MEME-ME-KARI-KARI_KAKAKATO | Firewood cut into 2 groups (pine, alder), length up to 1 m | m3 | ||||||||||
| MEPU-SA-KARI-KARI_KAMEKAME | Acrylic-based protective mastic putty, universal | kg | ||||||||||
| RIKA-RI-KARI-KALI_KAKATOME | Polyethylene cable plugs for asbestos pipes, inner diameter 100 mm | 100 Nr | ||||||||||
| RIPU-RI-KASA-KAME_KAKAKAME | Non-pressure chrysotile cement pipes, nominal diameter 100 mm | m | ||||||||||
| RIPU-TO-KASA-KALI_KASAMEME | Polyethylene coupling for chrysotile cement pipes, nominal outer diameter 100 mm | Nr | ||||||||||
| DXME-MEME-KARI_KAPUME | Equipment for horizontal soil drilling based on a vehicle with a load capacity of up to 3 tons, traction force of 30 tons | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||