AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KASA-ME-KAVO-MEPU | Precast reinforced concrete structures | m2 | ||||||||||
| ME_MEKAKA_TORI | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MEME-KALI_KAKASAPU | Welding electrodes for welding low-alloy and carbon steels ANO-6, E42, diameter 6 mm | t | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMEPU | Ready-mixed masonry mortar, cement, M100 | m3 | ||||||||||
| KALI-RI-KALI-MERI_KAKAKAME | Auxiliary metal structures predominantly made of thick-gauge steel or rolled sections, with or without holes | t | ||||||||||
| DXME-KASA-MERI_KAKAME | Rail-mounted jib cranes, lifting capacity 50-100 t | Machine hours | ||||||||||
| PU_MEKAKA_MEKAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-MERI_KAKAME | Electricity: consumption 69 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KAPU_KAKARI | Tractor units, load on the fifth wheel coupling up to 15 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAKARI | Heavy-duty semi-trailers, load capacity up to 40 t | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||