AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RITO-SA-KARI-KATO | Sheet pile made of electrically welded pipes with a composite lock-type pinion connection | t | ||||||||||
| ME_MEKAKA_PUTO | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAME-KANE_KAKATOTO | General-purpose graphite grease | kg | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-LI-MEME-KALI_KARITOKA | Welding electrodes for welding low-alloy and carbon steels UONI 13/55, E50A, diameter 4-5 mm | kg | ||||||||||
| KAVO-TO-KAME-KARI_KAKARIVO | I-beams with parallel flanges, steel grades St3sp, St3ps, No. 20B-60B | t | ||||||||||
| KAVO-TO-KASA-KARI_KAKARIME | Hot-rolled sheet metal, steel grades St3sp, St3ps, width 1200-3000 mm, thickness 1-8 mm | t | ||||||||||
| KAVO-TO-KAVO-KARI_KAKASAVO | Hot-rolled steel angle bar, steel grades St3sp, St3ps, shelf width 35-56 mm, shelf thickness 3-5 mm | t | ||||||||||
| MEME-ME-KATO-KANE_KAKAPUPU | Edged board made of hardwood (alder), dry, length 4-6.5 m, all widths, thickness 25, 32, 40 mm, grade II | m3 | ||||||||||
| MEPU-PU-KAPU-KAME_KAKAKAME | Nitroenamel NC-132K | kg | ||||||||||
| RITO-SA-KAME-KAVO_KAKASAKA | Electric-welded straight-seam and spiral-seam steel pipes, strength class K38, outer diameter 820 mm, wall thickness 9 mm | m | ||||||||||
| DXME-KARI-KAME_KAKANE | Vibratory pile drivers, eccentric moment 46 kgm, with a hydraulic station with a capacity of 408.6 kW. | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KANE_KAKALI | Crawler cranes, lifting capacity 25 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KANE_KAKADX | Cranes on crawler tracks, load capacity 50 t | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KAPU_KAKATO | Tractor units, load on the fifth wheel coupling up to 30 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAMEPU | General purpose semi-trailers, load capacity up to 30 t | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATOPU | Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 1 | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||