Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Open this position in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Introduction into and removal from the working face of a mechanized tunnel boring complex with a hydraulic load with a diameter of over 5.4 to 6.5 m

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/