AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_RIDX | Average work load 2.9 | hrs | ||||||||||
| KAME-RI-KATO-KATO_KAMERIRI | Bitumen-polymer waterproofing mastic, roofing, for building structures and roof construction (repair), cold, ready to use, temperature range from -20 to +40 °C, adhesion strength to metal/concrete not less than 0.9/0.6 MPa, consumption for waterproofing/roofing 2.5-3.5/3.8-5.7 kg/m2 with a coating thickness of 2 mm | kg | ||||||||||
| KAME-LI-KALI-RINE_KAKARITO | Foamed polyethylene thermal insulation sealing cord, round solid cross-section, density 25-40 kg/m³, diameter 6 mm | 100 m | ||||||||||
| MEPU-PU-KAME-MESA_KAKAKARI | Latex-based acrylic primer for gypsum screeds, plasters, and tile adhesives | kg | ||||||||||
| MEPU-SA-KADX-KALI_KAKATORI | Solvent P-5 | t | ||||||||||
| DXME-KANE-KANE_KAPUSA | Single-mast hoists, load capacity up to 500 kg, lifting height 15 m | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||