| KASA-ME-KARI-KALI | Reinforced concrete signal posts | m3 | ||||||||||
| RISA-ME-KANE-KATO | Railway track and signal signs | 100 Nr | ||||||||||
| RISA-ME-KANE-RITO | Crossovers | set | ||||||||||
| ME_MEKAKA_TOKA | Average workload 3.0 | hrs | ||||||||||
| KAME-TO-KAPU-KAVO_KAKAMETO | Coal tar oil for wood impregnation | t | ||||||||||
| RISA-ME-KAME-KARI_KAKAKARI | Impregnated softwood beams for turnouts | m3 | ||||||||||
| RISA-ME-KAME-KASA_KAKAMERI | Sleepers made of coniferous wood, impregnated, for broad gauge railways, type II | Nr | ||||||||||
| RISA-ME-KATO-KARI_KAKAKAME | Crutches for broad gauge railways, cross section 16x16 mm, length 165 mm | t | ||||||||||
| RISA-ME-KATO-KAPU_KAKAMEME | S-shaped steel staples for reinforcing the ends of sleepers against cracking, dimensions 155x130x20 mm | 1000 Nr | ||||||||||
| RISA-ME-KAPU-KALI_KAKAKATO | Track screws with square head, diameter M24, length 170 mm | t | ||||||||||
| RISA-ME-KANE-MEDX_KAKANEME | Rubber rail pad for underlay, type CP-67 | Nr | ||||||||||
| DXME-KASA-KALI_KAKARI | Railway cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KAME_KAKARI | Hydraulic jacks, lifting capacity 6.3-25 t | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 73 t | Machine hours | ||||||||||
| DXME-KADX-KASA_KARIRI | Broad gauge shunting locomotives, power 550 kW (559.3 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MEKA_KASAME | Electric tamping machines | Machine hours | ||||||||||
| DXME-KADX-MERI_KATOME | Universal track wrenches | Machine hours | ||||||||||
| DXME-KADX-MERI_KATOME | Electricity: consumption 0.5 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MERI_KASAME | Crutch drivers | Machine hours | ||||||||||
| DXME-KADX-MERI_KASAME | Electricity: consumption 0.69 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKAME | Rail cutting machines | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKAME | Electricity: consumption 1.91 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKARI | Rail drilling machines, power 1.15 kW | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKARI | Electricity: consumption 0.38 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKATO | Drilling and grinding machines | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||