AI
CSI
NRM2
Workers
Quick Facts
Total Cost
0
Workers/Unit
h
Labor Hours
0
Resources
0
Machines
0
Steps
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RITO-TO-KANE-KASA | Steel water and gas pipes | m | ||||||||||
| RITO-VO-KAPU-KANE | Steel sharp-bend elbows | Nr | ||||||||||
| RITO-VO-KAPU-KAVO | Concentric seamless steel transitions | Nr | ||||||||||
| RIPU-ME-KARI-KAME | Pipe clamps | Nr | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| RI_MEKAKA_KANE | Grade 6 worker | hrs | ||||||||||
| KAME-ME-KARI-KAPU_KAKAMERI | General-purpose asbestos cardboard, grade KAON-1, thickness 4 and 6 mm | t | ||||||||||
| KAME-TO-KARI-KATO_KAKAKAME | Acetylene gas, technical grade | m3 | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MELI-KALI_KAKASAPU | Straight profile grinding wheel, dimensions 230x5x22 mm | Nr | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMEPU | Ready-mixed masonry mortar, cement, M100 | m3 | ||||||||||
| KAVO-TO-KAVO-KARI_KAKANEKA | Hot-rolled steel angle bar, steel grades St3sp, St3ps, shelf width 20-32 mm, shelf thickness 3-4 mm | t | ||||||||||
| MEPU-PU-KAME-KAME_KAKAKATO | GF-021 primer | t | ||||||||||
| MEPU-PU-KARI-KAPU_KARITORI | MA-22 oil paint, colored | t | ||||||||||
| RITO-TO-KANE-KASA_KAKARIME | Non-galvanized welded steel pipes for water and gas supply without thread, ordinary, nominal diameter 20 mm, wall thickness 2.8 mm | m | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-RIME-MEDX_KAMEDX | Hydraulic manual pipe bending machines for bending pipes with an outer diameter up to 60 mm | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||