| KASA-ME-KAVO-MEPU | Precast reinforced concrete structures | Nr | ||||||||||
| RINE-ME-KAME-KARI | Bolt sets with spherical washers | set | ||||||||||
| RINE-ME-KAME-KAPU | Tubing plugs | kg | ||||||||||
| ME_MEKAKA_PULI | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MESA-MERI_KAMERITO | Threaded steel studs, thread diameter M27, length 1100-2000 mm | t | ||||||||||
| RINE-ME-KAME-KASA_KAKAMEME | Cast iron tubing for subways, outer ring diameter from 5.5 m to 10.5 m | t | ||||||||||
| RINE-ME-KARI-KAPU_KAKAKARI | Steel wedge-shaped gaskets, weight up to 0.5 t | t | ||||||||||
| DXME-KATO-MEDX_KADXME | Hand-held pneumatic wrenches for use with stationary compressor stations | Machine hours | ||||||||||
| DXME-KANE-KATO_KATOTO | Auxiliary mine winches with a pulling force of 13.73 kN (1.4 t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KATOTO | Electricity: consumption 0.46 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||