AI
Workers
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RITO-SA-KAME-KAVO | Steel pipes | m | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| RI_MEKAKA_KANE | Grade 6 worker | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MELI-KALI_KAKASAPU | Straight profile grinding wheel, dimensions 230x5x22 mm | Nr | ||||||||||
| MEME-ME-KATO-KAME_KAKANETO | Edged coniferous timber (spruce, pine), natural moisture content, length 2-6.5 m, width 20-90 mm, thickness 20-90 mm, grade III | m3 | ||||||||||
| DXME-MEKA-KASA_KAMEKA | Pipe layers, rated load capacity 50 t | Machine hours | ||||||||||
| PU_MEKAKA_KADXKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KADX_KAMERI | Equipment for hydraulic testing of pipelines, low discharge pressure 0.1 MPa (1 kgf/cm2), high discharge pressure 10 MPa (100 kgf/cm2) when operating from mobile power stations | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MENE-KAME_KAKARI | Mobile power stations, 4 kW capacity | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATOTO | Welding units for manual arc welding on a tractor, welding current up to 250 A, number of stations 2, tractor power 79 kW (80.5 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||