AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAVO-RI-KARI-MENE | Reinforcing ropes | kg | ||||||||||
| KAVO-PU-KAME-KAME | Steel foundation anchors | t | ||||||||||
| ME_MEKAKA_PUTO | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KATO_KAKAKAME | Acetylene gas, technical grade | m3 | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-TO-KAPU-KARI_KAKAKAPU | M-10DM diesel engine oil | kg | ||||||||||
| KAME-TO-KASA-MEKA_KAKAKAME | Ground graphite | t | ||||||||||
| KALI-RI-KALI-MERI_KAKAKAME | Auxiliary metal structures predominantly made of thick-gauge steel or rolled sections, with or without holes | t | ||||||||||
| KAVO-RI-KARI-MENE_KAKAMEME | Steel reinforcement ropes | kg | ||||||||||
| KAVO-TO-KATO-KAPU_KAKAMERI | Light wire, diameter 1.1 mm | t | ||||||||||
| MEKA-TO-KAME-KASA_KAKAKARI | Zinc powder, grade PC2 | kg | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-MEPU_KARIRI | Special assembly cranes (derrick cranes), lifting capacity 65 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-MEPU_KARIRI | Electricity: consumption 12.9 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KAME_KAKAPU | Hydraulic jacks, load capacity 200 t | Machine hours | ||||||||||
| DXME-KANE-KATO_KAPUSA | Hand and lever winches with a pulling force of 14.72 kN (1.5 t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANERI | Electric winches with pulling force up to 31.39 kN (3.2 t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANERI | Electricity: consumption 0.39 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KATO_KARIME | Mobile diesel fuel heating furnaces, tank capacity 0.5 m3 | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MEDX-MEKA_KARIRI | Medium-pressure diesel trailer pump stations, flow rate up to 320 m3/h, pressure up to 50 m | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||