AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAVO-PU-KATO-KATO | Reinforcement and rolled metal | t | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| RI_MEKAKA_KANE | Grade 6 worker | hrs | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MELI-KALI_KAKASAPU | Straight profile grinding wheel, dimensions 230x5x22 mm | Nr | ||||||||||
| KAVO-TO-KATO-KAPU_MEKAMEKA | General purpose low carbon steel wire, diameter 1.30-2.50 mm | kg | ||||||||||
| KAVO-PU-KAME-KARI_KAKAMEME | Embedded and overlay parts manufactured without welding, bending, drilling (punching) holes, supplied separately | t | ||||||||||
| DXME-KASA-KARI_KAKANE | Gantry cranes, lifting capacity 50 t | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKANE | Electricity: consumption 51.15 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKASA | Electric overhead cranes, lifting capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKASA | Electricity: consumption 2.97 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKADX | Electric overhead cranes, lifting capacity 32 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKADX | Electricity: consumption 46.2 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKARI | Trucks, load capacity up to 8 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KAPU_KAKALI | Tractor units, load on the fifth wheel coupling up to 30 t, gross vehicle weight up to 130 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAKASA | Heavy-duty semi-trailers, load capacity up to 110 t | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATOPU | Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 1 | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-RIME-MERI_KAKARI | Crank-type guillotine sheet metal shears | Machine hours | ||||||||||
| DXME-RIME-MERI_KAKARI | Electricity: consumption 6.11 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MERI_KAKAPU | Electric shears | Machine hours | ||||||||||
| DXME-RIME-MERI_KAKAPU | Electricity: consumption 0.23 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MENE_KAKAME | Combined electric press shears, nominal force 630 kN, power 5 kW | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MENE_KAKAME | Electricity: consumption 1.58 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KARIME | Rebar bending machines | Machine hours | ||||||||||
| DXME-RIME-MEDX_KARIME | Electricity: consumption 0.99 kWh/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOME | Drilling machines | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOME | Electricity: consumption 0.45 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KAPUPU | Equipment sets for cutting parallel metric threads on steel reinforcement bars with a diameter of 12-57 mm | Machine hours | ||||||||||
| DXME-RIME-MEDX_KAPUPU | Electricity: consumption 7.92 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KAPUNE | Electrohydraulic forging machines for cold forging of reinforcing bars and preparing them for cutting parallel threads | Machine hours | ||||||||||
| DXME-RIME-MEDX_KAPUNE | Electricity: consumption 4.95 kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||