Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUPU | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KADX-KAME_KAKAKAME | Ammonite 6ZhV in cartridge form, diameter 32 mm | t | ||||||||||
| KAME-LI-KADX-KAME_KAKAKARI | Ammonite 6ZhV in powder form | t | ||||||||||
| KAME-LI-KADX-KARI_KAKATOME | ED-KZ waterproof short-delay electric detonators | 1000 Nr | ||||||||||
| KAME-LI-KADX-KATO_KAKAKAME | APRN wire for blasting operations, VP brand | 1000 m | ||||||||||
| KAME-LI-KADX-KATO_KAKAMEME | Detonating cord | 1000 m | ||||||||||
| MEME-ME-KARI-KAPU_KAKATOME | Round coniferous timber, unpeeled, length 3-6.5 m, diameter 14-24 cm, grade II-III | m3 | ||||||||||
| MEME-ME-KATO-KASA_KAKANESA | Unedged coniferous boards, natural moisture content, length 2-6.5 m, width 100-250, thickness 30-50 mm, grade III | m3 | ||||||||||
| DXME-METO-KATO_MEMERI | Special-purpose all-terrain vehicles, load capacity up to 1.5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||