AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_MENE | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MESA-KANE_KAMERIRI | Steel construction nails, diameter 1.8 mm, length 50-60 mm | t | ||||||||||
| MEME-ME-KATO-KAME_KAKANEPU | Edged coniferous timber (spruce, pine), natural moisture content, length 2-6.5 m, width 20-90 mm, thickness 20-90 mm, grade IV | m3 | ||||||||||
| MEME-ME-KATO-KANE_KAKALIME | Edged softwood board, natural moisture content, length 2-6.5 m, width 100-250 mm, thickness 25 mm, grade III | m3 | ||||||||||
| DXME-KADX-KARI_KAKAVO | Non-tipping mine cars, capacity 2.5 m3 | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||