| ME_MEKAKA_TOVO | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAME-KAME_KAKAKAME | B-70 aviation gasoline | t | ||||||||||
| KAME-TO-KAPU-KAVO_KAKARITO | M-8DM winter diesel engine oil | t | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEME-KALI_KAKAPUME | Welding electrodes for welding low-alloy and carbon steels E55, diameter 4 mm | t | ||||||||||
| KAME-LI-MEDX-KAPU_KAKAKARI | Rolled vulcanized rubber plates | kg | ||||||||||
| KAVO-TO-KASA-KARI_KAKAKAME | Hot-rolled sheet metal, steel grades St3sp, St3ps, width 1200-3000 mm, thickness 9-12 mm | t | ||||||||||
| MEPU-ME-KAPU-KARI_KAKAKAME | Adhesive, brand 88-NP | kg | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KANERI | Electric winches with pulling force up to 31.39 kN (3.2 t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANERI | Electricity: consumption 0.39 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||