AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| RI_MEKAKA_KANE | Grade 6 worker | hrs | ||||||||||
| RISA-RI-KAME-KANE_KAKAKATO | End collet clamp KS-086 | Nr | ||||||||||
| RISA-RI-KAME-MEKA_KAKAKANE | Rocker arm made of two equilateral triangular galvanized steel plates 12 mm thick, 124 mm long, with 24 mm diameter holes at the corners of the plates and three rollers with split pins for connecting smooth-rod insulators, permissible total load 36 kN, breaking load class 100 kN | Nr | ||||||||||
| RISA-RI-KAME-RIKA_KAKATOME | Galvanized steel rod with two mounting lugs rotated 90° relative to each other, diameter 20 mm, length 1000 mm | Nr | ||||||||||
| RISA-RI-KAME-RIME_KAKALIRI | Galvanized steel compensation block for equalizing contact wire tension, block diameter 100 mm, permissible load 40 kN, block length with multi-strand rope 880 mm | Nr | ||||||||||
| RISA-RI-KARI-KADX_KAKAMETO | Steel clamp for fastening a single load bar with one lug, load diameter 300 mm, thickness 30 mm | Nr | ||||||||||
| RISA-RI-KARI-MEKA_KAKATOKA | Double steel bar for cast iron closed-section loads, number of loads 64 pcs, distance between load centers 370 mm, bar thickness 30 mm, bar length 1808 mm | Nr | ||||||||||
| RISA-TO-MEPU-KAME_MEKASAKA | Double steel intermediate link 2PR-12-1 | Nr | ||||||||||
| DXME-KADX-KAME_KAMEME | Railcars for operation on a contact network with an insulated mounting platform and a crane unit equipped with removable cradles | Machine hours | ||||||||||
| PU_MEKAKA_KANESA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||